Under both standards, the routine inspection and test records are kept until the next inspection or test of the same type, plus one more year. Acceptance test records are kept for the life of the system, and NFPA 25 adds as-built drawings and other design documents to that list. NFPA 25 puts the records on the property owner. NFPA 72 makes the system owner responsible for acceptance records (per a 2022 edition summary), and the routine-record rules we checked don’t name a keeper.
That short answer covers most questions from building owners. The details below cover the cases that trip teams up: five-year tests, heat detectors tested on a rotation, supervising station signals, and what has to be on each report so it counts as a record at all.
Wording here is from the NFPA 25 2023 edition preview and from secondary sources quoting NFPA 72 2022. Your AHJ may enforce a different edition or add local rules, so confirm before you shred anything. NFPA offers free read-only access to its standards (sign-in required).
NFPA 25: sprinkler, standpipe, pump and other water-based systems
Who keeps them. In the 2023 text, records are made for all inspections, tests and maintenance, and they’re maintained by the property owner. They may be stored and accessed electronically, and they have to be made available to the AHJ on request (NFPA 25, 2023 preview, 4.3).
What stays for the life of the system. As-built installation drawings, hydraulic calculations, original acceptance test records and device manufacturer’s data sheets (2023 text, 4.3.4). Check the adopted edition and your AHJ.
How long the routine records stay. A minimum of one year after the next inspection, test or maintenance of that type required by the standard (2023 text, 4.3.5). SFPE’s summary of the change that introduced this rule reads it as one year after the next activity, which works out to about two years for annual records and six for five-year records (SFPE).
The National Fire Sprinkler Association gives a worked daily example: a daily program started January 1, 2019 keeps 2019 and 2020 dailies, and the January 1, 2019 record can go on January 1, 2021 (NFSA).
What an NFPA 25 record has to show
The 2023 text lists five items (NFPA 25 preview, 4.3.2):
- The procedure or activity performed (inspection, test or maintenance)
- The organization that performed it
- The required frequency of the activity
- The results and date
- The name and contact information of the qualified contractor or owner, including the qualified personnel performing it
Item 3 is easy to miss on homegrown forms. A report that says “main drain: OK” with no visit type or frequency anywhere on it leaves that item out. Our NFPA 25 sprinkler inspection checklist has a column for it.
NFPA 72: fire alarm systems
This section follows the 2022 edition as summarized by BFAAM. Confirm each rule in the edition your AHJ adopted.
Acceptance records. The system owner is responsible for them, and acceptance test records are kept for the life of the system. Paper or electronic media are permitted (BFAAM summary of NFPA 72 2022, 14.6).
Routine records. Maintenance, inspection and testing records are retained until the next test and for one year after.
Heat detectors on a rotation. For systems with restorable fixed-temperature, spot-type heat detectors tested over multiple years, records are kept for the five years of testing and one year after. That’s six years for the full set.
Supervising station signals. These are the monitoring company’s records, not the owner’s. The monitoring service provider keeps records of signals received at the supervising station from maintenance, inspection and testing for at least a year (12 months in the 2022 summary), paper or electronic, with a hard copy to the AHJ on request.
Simulated operations. If the operation of a device, circuit, control unit function or special hazard interface is simulated, the inspection or test form has to say so. This is a form-design point as much as a retention one. Our NFPA 72 fire alarm inspection form and the NFPA 72 testing requirements guide cover the test side.
Medium. Records have to be on a medium that will survive the retention period. A thermal-paper printout from a panel or controller, especially one left in a hot mechanical room, can fade well before the retention period ends. Scan or photograph it, or save the data electronically, and keep that copy with the report.
Retention at a glance
| Record | NFPA 25 | NFPA 72 |
|---|---|---|
| Acceptance test records | Life of system | Life of system (system owner) |
| As-builts, hydraulic calcs, data sheets | Life of system | Acceptance records: life of system |
| Routine inspection, test, maintenance | 1 year after the next one of that type | Until the next test plus 1 year |
| Multi-year rotations | Same rule (5-year activity: 6 years) | Heat detector rotation: 5 years of testing plus 1 |
| Supervising station test signals | n/a | Monitoring company keeps them: at least a year (12 months in the 2022 summary) |
| Electronic records | Permitted | Permitted, on a medium that survives |
NFPA 25 column: 2023 text. NFPA 72 column: per the 2022 edition as summarized by BFAAM. Confirm in the edition your AHJ adopted.
For how often each activity happens, use our NFPA 25 and NFPA 72 inspection frequency chart.
Why the comparison matters more than the storage
NFSA calls NFPA 25 “essentially a comparison document”: the point is comparing how the system performs today with how it did at acceptance (NFSA). The main drain test is the clearest case. A residual pressure reading means little until it’s set next to the acceptance number and last year’s number. If the acceptance records are gone, NFSA notes that’s technically a deficiency in itself.
So retention isn’t only about surviving an audit. The records you keep are the baseline your next inspector reads against.
Who holds what: owner vs contractor
NFPA 25 puts the records on the property owner. NFPA 72 makes the system owner responsible for acceptance records (per a 2022 edition summary), and the routine-record rules we checked don’t name a keeper. In practice, the contractor generates the reports, and owners often rely on the contractor’s copies. A few habits that keep this clean:
- Send the owner a copy of every report at completion, in a format they can keep. Note the delivery date in your own records.
- Keep your own copy for at least the same period. Owners lose files, and a new property manager may ask you for past reports. Check your contract and your insurer.
- Ask for acceptance records at contract start. If the owner can’t produce them, note it on the first report and tell the owner in writing, so the gap is on record from day one.
- Keep impairment records with the report. NFPA 72 requires the system owner to keep impairment records for one year after the impairment is corrected (2025 text, 10.21.3). Keeping fire-watch logs with them is good practice.
- Keep deficiency follow-up with the report. A deficiency noted in March and repaired in May should be traceable from one record to the other.
Setting up a retention routine
This works for paper or software. Adjust to your AHJ.
- Tag every record with type and frequency. “Annual main drain,” “quarterly waterflow,” “semiannual heat detector rotation, year 3 of 5.” The retention clock depends on it.
- Set a provisional discard date at creation. For a routine NFPA 25 record, a safe reading is: the due date of the next activity of that type, plus one year. Recompute it when that next activity is done. If it runs late, the date moves out with it, so a late inspection never causes an early purge.
- Keep life-of-system documents in a separate folder per system that never gets purged.
- Review once a year. Purge only what has passed its discard date and isn’t tied to an open deficiency, a dispute, or a loss or insurance claim.
- Check local rules, your contract and your insurer. Any of them can call for longer retention than the standards do, and many contractors keep records longer than the minimum. When in doubt, keep it.
Illustrative example (made-up dates, for the arithmetic only): an annual sprinkler inspection done March 10, 2025 with the next annual due by March 2026. The 2025 report can be discarded no earlier than one year after the 2026 inspection, so around March 2027 if the 2026 inspection happens that month, because the clock runs from when it happens. A five-year internal pipe assessment done in 2025 with the next due in 2030 stays until 2031.
Where software helps
Software can stamp each record with activity type, frequency, date, results and the technician’s name. With your company’s name and contact details on the report, that covers the five NFPA 25 items.
In Forz’s fire inspection software, technicians record Pass, Fail or Bypass per device with photos, history is kept per system, failed devices flow into a repair estimate and job, and customers see their inspection reports in the Customer Portal. See fire protection for the wider workflow. Forz is $50 per user per month on annual billing or $60 month-to-month, with a 10-user minimum. See pricing.
Frequently asked questions
How long do I keep an annual sprinkler inspection report?
Under NFPA 25, one year after the next annual inspection. In practice that means about two years.
Do I have to keep paper copies?
Neither standard requires paper. NFPA 25 permits electronic storage, and NFPA 72 permits paper or electronic on a medium that survives the retention period (per the 2022 edition summary). Your AHJ may ask for a hard copy on request.
Who is responsible for keeping the records, the contractor or the owner?
NFPA 25 says the property owner. NFPA 72 names the system owner for acceptance records, and the retention rules we checked don’t name a keeper for routine ones. Contractors should keep their own copies anyway.
What if the building has no acceptance test records?
Note it on your report. NFSA describes missing acceptance records as technically a deficiency under NFPA 25. Without them, later tests have no original baseline.
Sources
- NFPA 25, 2023 edition, preview of Chapter 4 (4.3 Records)
- National Fire Sprinkler Association, “The Basics of NFPA 25 Record Keeping” (Mar 8, 2021, archived copy because the original URL is no longer live)
- SFPE, “Changes to the 2008 Edition of NFPA 25”
- BFAAM, NFPA 72 2022 Chapter 14 summary (14.6 Records)
- NFPA free access to codes and standards